Data center power systems are becoming increasingly interconnected. Grid interaction, protection, energy management, backup power, dynamic loads, and power conversion all need to work together reliably before deployment.
On September 10, from 11:00 AM–12:00 PM ET, join OPAL-RT and GridStor for a technical webinar exploring how HIL and PHIL testing can help validate the data center gray space and identify critical integration risks before deployment.
You’ll hear from:
- Varun Bhombore, Sr. Manager, Commissioning & Controls at GridStor, bringing an industry perspective from utility-scale BESS, controls, grid integration, and commissioning
- François Berthelot, Head of Division – Energy – North America at OPAL-RT
- Lyes Ait-Oubelli, Electrical Modeling and Simulation Analyst at OPAL-RT, who will lead a practical HYPERSIM demonstration
The session will look at practical validation workflows across grid compliance, protection, energy management, UPS and backup power, dynamic AI/GPU loads, and coordinated control strategies.
Have a data center validation challenge you’d like the speakers to address?
Drop your question in the comments before the webinar and we may bring it into the live Q&A.